Mistakes in steel are buried forever once concrete is poured. Our engineers inspect reinforcement, cover and shuttering at critical stages and give you a written report, so you can build with confidence even when you cannot be on site.

When you need it

Book site visits for every stage where mistakes get buried: excavation and footing steel, column steel, and each slab before the concrete is poured.

How we work

An engineer checks reinforcement size, spacing, laps, cover blocks and shuttering against the drawings, points out corrections to your contractor on the spot, and sends you a photo report. You get peace of mind even when you cannot be on site yourself.

What you receive

  • Stage-wise site inspection
  • Rebar, cover and shuttering checks before pours
  • Photo report after every visit
  • Advice to your contractor on site

Questions clients ask

How many site visits do I need?

At minimum one visit before every major concrete pour, footings, columns, each roof slab, plus visits when something on site differs from the drawings. We agree the schedule with you at the start.

From our sites

What we check before the concrete goes in

Photos from our own site visits. At each stage the engineer checks bar sizes, spacing, laps and cover against the drawings, and the contractor fixes anything wrong before the pour.

  1. Footings

    We check: Mat bar size and spacing, cover blocks, and column starters set out to the grid.

    Footing mat checked before the pour
    Mat on cover blocks, pit ready for concrete
  2. Columns

    We check: Bar count and size, lap lengths, tie spacing and hooks.

    Column cages set out across the grid
    Ties at the right spacing, all the way up
  3. Plinth beams

    We check: Stirrups closer near columns, bars anchored into the column.

    Plinth beam cages meeting at a column
    Grade beam steel in sandy soil
  4. Roof slab

    We check: Main and distribution bars, extra steel at supports, conduits clear of the cover.

    Roof slab and beam steel before casting
    Final walk across the slab before the pour
  5. Engineer on site

    We check: Drawing in hand, corrections pointed out, a photo report to you after the visit.

    Every bar checked against the drawing
    Explaining the findings to the owner

Pouring soon? Book a visit before the concrete goes in.

Book a site visit

Site visits & rebar checking across Tamil Nadu

Start with a conversation

Ready to start your site visits & rebar checking?

Share your plot size and plans, we’ll tell you honestly what it takes.

Call WhatsApp